Load Bank Maintenance Schedules


Simplex Load Banks are designed to require minimum maintenance. All components have been chosen for a long, reliable life. Two basic intervals of maintenance are required: "Each Operation" and "Every 50 Hours of Operation or 6 Months" (whichever comes first.)